It’s up, but wrong…

June 24, 2008

Today I got the delivery from Caley for the roof of the shed. A massive pile of timber and a 3.60 meter lintel to cross the door opening of the front wall. Ian, who drives the Caley truck, has this handy fork lift attached to his truck which he uses to off load materials. Ian was so good to lift that lintel up the wall. That was great and really much appreciated. Shame that it’s positioned the wrong way (it’s a 6”x4” lintel which should be on its 6” side and now is on its 4”)… I noticed this when Ian was long gone but luckily he’s back this week with some more stuff, so I’ll ask him to help me out a second time.

Comments

2 Responses to “It’s up, but wrong…”

  1. val on July 6th, 2008 21:21

    Is it right yet??

    Val

  2. roger on July 6th, 2008 21:21

    Nope, it’s still wrong. I need assistance of able bodied men or heavy equipment to correct it :-) Neither has turned up yet :-(