Foundations readyThe month of May 2006 is almost history and the build is now well underway. Foundations have been completed, the first part of the kit is on site and the joiners are busy erecting it.

The foundations of the house with the concrete floor are poured and ready. The pipework for drainage is clearly visible. The kit was delivered on site by SkyeHomes as agreed. The blue cloth is the insolation material which sits between the wooden panels and the outer stone walls. Delivery of the kit was a smooth process.

The roof trusses over the central rectangular shape of the house are specifically constructed to support attic space. The original designs has been amended with two Velux windows to allow daylight inside the attic.

Preparing the foundations for the kitKit componentsRoof trussesJoiner van

Comments

Got something to say?





  • Categories

    About the house Book of Jingles Events Food & Drink History In the news Local Movies Music Nature Rugby World Cup 2007 Scenic spots Shed Trips

  • Sign in to Google Friends Connect

  • Google Friend Connect

  • Share your thoughts

  • Currently reading...

    "The Dragon Masters" by Jack Vance (1963), humans battling against grefs. Who is master and who is slave? [Review: Magnificent! Great story in a typical early Vance setting. Rating: 5 out of 5]

    "The Dogtown Tourist Agency" by Jack Vance (1975), a story featuring Miro Hetzel, galactic effectuator. [Review: not bad but Vance has better stories. Rating: 3 out of 5]

  • Latest music...

    hairHair (1968, Original Broadway recording). Some naughty lyrics for that time!!


    vboysAn Rathad a Bhatarsaigh, by the Vatersay Boys

  • Recent comments